PALM SPRINGS MIDDLE SCHOOL
GOB RENOVATION PROJECT
Addendum 01
(click to expand/collapse)

Name | Size | ||
Addendum 1 combined | 2.0 MB |
Addendum 02
(click to expand/collapse)

Name | Size | ||
0. BID ADDENDUM #2 - combined | 2.2 MB |
Addendum 03
(click to expand/collapse)

Name | Size | ||
01. PSMS - CDs 100_ Rev.2 | 25.6 MB | ||
PSMS - Addendum 3 - combined | 4.2 MB |
ADDENDUM 03 -AS BUILTS
(click to expand/collapse)

Name | Size | ||
1994 Technology & Science ED Labs Retrofit | 6.3 MB | ||
Science Classroom Renovations | 4.5 MB |
ADDENDUM 03 -AS BUILTS - 1980 Fire Restoration
(click to expand/collapse)

Name | Size | ||
BLG D 2nd floor plan A-1 | 7.8 MB | ||
E-1 | 10.6 MB | ||
Elevations A-2 | 9.1 MB | ||
M-1 | 9.2 MB | ||
partial plan A-3 | 7.2 MB |
ADDENDUM 03 -AS BUILTS - Original Facility
(click to expand/collapse)

Name | Size | ||
1957 Original Facility | 64.5 MB |
ADDENDUM 03 -AS BUILTS -PSE 1963 Locker Room Addition
(click to expand/collapse)

Name | Size | ||
boys and girl locker room 1st floor plan A1 | 4.7 MB | ||
boys and girl locker room elevations A2 | 6.6 MB | ||
Details A3 | 8.1 MB | ||
E1-1.2 | 7.2 MB | ||
E1-1 | 6.0 MB | ||
E1 | 358.2 KB | ||
existing corridor 1st floor plan A-1 | 7.2 MB | ||
first floor plan mechanical A1.1 | 6.2 MB | ||
S-1 | 7.0 MB |
ADDENDUM 03 -AS BUILTS -PSE 1968 Addition Renovation
(click to expand/collapse)

Name | Size | ||
A1 | 13.3 MB | ||
A2 | 12.5 MB | ||
Boys locker room 001 | 50.5 KB | ||
Floor. Foundation, Roof Plan 002 | 269.9 KB | ||
M-1 | 11.8 MB | ||
Rehearsel Room and covered walkway lighting plan | 227.3 KB |
ADDENDUM 03 -AS BUILTS - PSE 1982 Electrical Service
(click to expand/collapse)

ADDENDUM 03 -AS BUILTS - PSE 1985 Fire Alarm System
(click to expand/collapse)

Name | Size | ||
Life Safety Site Plan E-F.2 | 2.0 MB | ||
Overall Life Safety Site Plan E-F.1 | 1.9 MB |
ADDENDUM 03 -AS BUILTS - PSE 1994 Retrofit Technology
(click to expand/collapse)

Name | Size | ||
Cover | 73.1 KB | ||
data wiring riser diagram E-4 | 73.8 KB | ||
electrical classroom plan E-2 | 201.9 KB | ||
electrical details Currier Associates E-3 | 154.7 KB | ||
raceway building plan Currier Associates E-1 | 187.0 KB |
ADDENDUM 03 -AS BUILTS - PSE 1997 Addition Bldg 12 Remodeling Renovation
(click to expand/collapse)

ADDENDUM 03 -AS BUILTS - PSE 1997 Roof Replacement
(click to expand/collapse)

ADDENDUM 03 -AS BUILTS - PSE 2001 Addition Renovation State School BB1
(click to expand/collapse)

ADDENDUM 03 -AS BUILTS - PSE 2004 Main Electrical Room Upgrade
(click to expand/collapse)

ADDENDUM 03 -AS BUILTS - PSE 2006 New Contruction Renovations Site Work
(click to expand/collapse)

ADDENDUM 03 -AS BUILTS - PSE 2007 ADT Security
(click to expand/collapse)

Name | Size | ||
E-400 security camera system First floor plan | 274.9 KB | ||
E-401 secuirty camera system second floor plan | 129.0 KB |
ADDENDUM 03 -AS BUILTS - PSE 2013 iPrep Math
(click to expand/collapse)

Name | Size | ||
2013 iPrep Math | 2.3 MB | ||
A-1 BLG 12 site, life safety, demo plan | 442.3 KB | ||
A-1.1 BLG 12 life safety and demo plan | 426.1 KB | ||
A-1.2 BLG 12 site plan demo notes | 378.7 KB | ||
A-2 BLG 12 proposed enlarged floor plan, reflective ceiling plan with partition details | 263.6 KB | ||
A-2.1 BLG 12 proposed enlarged floor plan, reflective ceiling plan | 271.4 KB | ||
A-2.2 BLG 12 proposed enlarged floor plan, reflective ceiling plan with partition details | 262.5 KB | ||
A-3 BLG 12 Painting plan, carpet plan, furniture plan and schedule | 281.6 KB | ||
A-3.1 BLG 12 drainage and painting plan, carpet plan, furniture plan with schedules | 314.4 KB | ||
A.3.2 BLG 12 carpet, painting, furniture building plan | 308.7 KB | ||
Cover Index | 373.7 KB | ||
E0.00.1 | 226.5 KB | ||
E0.00 | 214.6 KB | ||
E3.00 | 196.9 KB | ||
E3.01.1 | 208.6 KB | ||
E3.01 | 204.8 KB | ||
M3.00.1 | 253.5 KB | ||
M3.00 | 250.3 KB | ||
M7.00.1 | 139.1 KB | ||
M7.00 | 115.3 KB |